Understanding Sling Tsi N141d Build 2

If you are looking for information about Sling Tsi N141d Build 2, you have come to the right place. I'm

Key Takeaways about Sling Tsi N141d Build 2

  • 3 weeks on receiving my fuselage kit, work continues on the rear fuselage. Video covers side skin riveting, wiring, installing ...
  • After a long wait I finally started
  • I went back to Boise in April/May 2023 to work on the plane. The plane is coming along nicely. One step closer to flying!
  • This is a short update video. Boise hotel and food options, wings and air conditioning.
  • I made it back out to Boise, Idaho the first week of June 2023. I worked mostly on the right wing and right fuel tank. I'm super happy ...

Detailed Analysis of Sling Tsi N141d Build 2

Haven't seen WEEK 1? Check it out here: https://youtu.be/gwyYsKwxTxI Follow us on Instagram to keep up with our Building Today, we are highlighting Jep Pablo as he shows us his brand-new Custom

Part

We hope this detailed breakdown of Sling Tsi N141d Build 2 was helpful.

Sling Tsi N141d Build 2.pdf

Size: 2.79 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents